i44i4I-4 P3 Corridor Design Consultant, From W of Kirkman Road to E of SR 434, Orange & Seminole Counties, FL:  The I-4 Ultimate Project is over 21 miles and is located in Central Florida. Below are some interesting project facts:

  • Construction Length: 11 miles
  • Construction Cost: Approximately $2 Billion
  • Bridges: 138 Bridges
    • 56 New (Including Pedestrian Crossings)
    • 71 Replacements
    • 10 Modifications
    • 1 Temporary Bridge
  • Interchange: 15 Major Interchanges Reconstructed

GCME is part of the I-4 P3 Corridor Design Consultant Team [as Geotechnical Sub-consultant], performing all the following tasks for the largest Public Private Partnership [P3] Project in Florida

  • Performed review and evaluation of all geotechnical information available for the project alignment for various segments of the corridor collected during the past 10+ years.
  • Recommended and performed a field exploration program based on proposed project scope for P3.
  • Preparation of the RFP Documents
  • Preliminary engineering required as per FDOT design standards to develop the Technical Criteria Package for the I-4 P3 project
  • Provided all geotechnical engineering reviews of all geotechnical engineering related issues prepared and submitted by the geotechnical consultant of the shortlisted concessionaire’s team.