i95I-95 HOV Lanes, From South of PGA Boulevard to South of Donald Ross Road, Palm Beach County, FL: Geotechnical Services for widening of I-95 for 3 miles, which included widening two existing bridges, MSE and sheet pile walls for grade separation, noise barrier walls, and sign and miscellaneous structures.  The foundation system at one bent for one of the bridges used drilled shafts to minimize/eliminate the effect of any vibration caused due to foundation construction to the existing underground drainage structures.

I-95 PD&E Study, South of Indrio Road to 1.26 mile North of CR512,  St. Lucie and Indian River Counties, FL: Geotechnical Services for the 21 mile long PD&E Study corridor along I-95, including four proposed bridge widening/replacements and one (1) new I-95 interchange.

I-95 PD&E Study, From Glades Road to Oakland Park Boulevard, Palm Beach and Broward County, FL: Geotechnical Services for the 13.6 mile long PD&E Study corridor along I-95, including sixteen proposed bridge widening/replacements and new I-95 interchanges.

I-95 Bridge over Box Culvert, Palm Beach County, FL: Geotechnical Services for designing a 60 foot long, single span bridge along I-95 over an existing 10’ x 11’ quadruple box culvert to accommodate possible future removal of the box culvert and to create an open channel.

I-95 Widening from St. Lucie to Indian River County Line to SR60 (Osceola Blvd.), Indian River County, FL:  This entire project corridor runs along I-95 (SR 9) with limits beginning at St. Lucie/Indian River County Line, proceeding north to SR 60, in Indian River County, Florida, a distance of about 6.5 miles.  The project includes widening I-95 from four (4) to six (6) lanes, where one 12 feet travel lane will be added in each direction by widening to the inside grass median of I-95.  The existing bridges over SR 60, 90th Avenue and 4th Street (Citrus Road) (total 6) will be replaced in order to accommodate the improvement.

I-95 Corridor Design Consultant, Palm Beach and Broward County, Florida

I-95 PD&E from SR-706 to BP/M County Line & from PB/M County Line to SR 708/Bridge Road, Palm Beach & Martin County

I-95 PD&E from SR-708/Bridge Road to SW High Meadows Ave., Martin County

I-95 Resurfacing (3R Project), Dania Cut-off Canal to South of South Fork North River Bridge, Broward County, FL 

I-95 Resurfacing (3R Project), North of Powerline Road Bridge to South of McNab Road Bridge, Broward County

I-95 Resurfacing (3R Project), North of McNab Road Bridge to Sample Road, Broward County, FL 

Mr. Partha Ghosh, Principal Engineer / President of GCME have served as the Senior Engineer / Project Manager & Geotechnical EOR for the following projects along I-95:

I-95 HOV Lanes, From Linton Blvd. to LWDD L-30 Canal, District 4, Palm Beach County, FL:  Geotechnical Services for widening of I-95 from Linton Boulevard to LWDD L-30, which included replacement/widening of five existing bridges, MSE and sheet pile walls for grade separation and sign and miscellaneous structures.

I-95 HOV Lanes, From LWDD L-30 Canal to Gateway Boulevard, District 4, Phase-I, Palm Beach County, FL:  Geotechnical Services for widening of I-95 for about 4 miles, which included replacement/widening of two existing bridges, MSE and sheet pile walls for grade separation and sign and miscellaneous structures.

I-95 HOV Lanes, From Gateway Boulevard to 6th Avenue, District 4, Phase-II, Palm Beach County, FL:   Geotechnical Services for widening of I-95 for about 4 miles, which included replacement/widening of two existing bridges, MSE and sheet pile walls for grade separation and sign and miscellaneous structures.

I-95 HOV Lanes, 6th Avenue to Forest Hill Blvd., District 4, Palm Beach County, FL:  Geotechnical Services for widening of I-95 for about 4 miles, which included replacement/widening of five existing bridges, MSE and sheet pile walls for grade separation, noise barrier walls, and sign and miscellaneous structures.

I-95 HOV Lanes, From Forest Hill Boulevard to Congress Avenue, District 4, Palm Beach County, FL:  Geotechnical Services for widening of I-95 for about 5 miles, which included replacement/widening of three existing bridges, MSE and sheet pile walls for grade separation, noise barrier walls, and sign and miscellaneous structures.

I-95 HOV Lanes, From Blue Heron Boulevard to PGA Boulevard, District 4, Palm Beach County, FL:  Geotechnical Services for field exploration in reference to widening of I-95 for about 3.4 miles.

Interstate I-95 / Palm Beach International Airport Direct Connector, Palm Beach County, FL

Interstate I-95 & Okeechobee Blvd. (SR 704) Flyover and Interchange Improvements, Palm Beach County, FL