Turnpike (SR 91) Widening from Becker Rd to Crosstown Pkwy MP 138.5-144.58; St. Lucie County; FPID No.: 446335-1-32-01

Turnpike (SR 91) Widening from S. of US 192 to Partin Settlement Rd. MP 242-243.5; Osceola County; FPID No.: 436194-3-32-01

Turnpike (SR 91) Widening from SR706 to Martin-Palm Beach County Line to I-95 Connector MP 117-123.7; Palm Beach & Martin County; FPID No.: 446218-1-32-01 & 446219-1-32-01

TSM&O TPK (SR 91) GRIFFIN ROAD INTERCHANGE IMPROVEMENTS (MP 54); FPID No.: 446224-2-32-01

SR 407 SAFETY AND ITS IMPROVEMENTS, Brevard County; FPID No.: 452109-1-32-01

PD&E / Design Widen Sawgrass (SR 869) from South of US 441 (SR 7) to Powerline Road; Mileposts (MP) 18 to 22; Broward County; FPID No.: 437153-1-22-01

PD&E / Design Widen Turnpike from N. of SR 70 to N. of SR 60 (MP 152-193); St Lucie, Okeechobee, Indian River and Osceola Counties; FPID No.: 423374-2-22-01

PD&E HEFT US 1 EXIT RAMP MODIFICATION LOOP RAMP TO NW (MP 0) AND HEFT WIDENING FROM US 1 SOUTH OF PALM DR TO CAMPBELL DR (MP 0-3); FM No.: 437206-1-22-01

Florida’s Turnpike Widening From Sunrise Boulevard to Atlantic Boulevard; PD&E & Final Design; Broward County; FPID No.:  406097-1-52-01

Florida’s Turnpike Widening From SR 821 (HEFT)/SR 91 Interchange to North of Johnson St.; Miami-Dade County; FPID No.: 406099-1-32-01

Florida’s Turnpike Enterprise – SR 821 (HEFT) / NW 12th Street Interchange; Miami-Dade County; FPID No.: 427687-1-32-01

Florida’s Turnpike Widening Atlantic Ave to Boynton Beach Blvd MP 82.4 to 87.3; Palm Beach County; FPID No.: 437169-1-32-01

Florida’s Turnpike Widening From N. of Sawgrass Expressway/SR 869 (MP 71.8) To N. of Glades Rd (MP 76.6); Broward County; FPID No.: 415927-1-32-01, 418214-1-32-01

Florida’s Turnpike Wide Miscellaneous Design Services; FPID No.: TBD Three (3) Contracts w/ 3 Primes

Florida’s Turnpike Widening From Lake Worth Road To Okeechobee Boulevard; Palm Beach County; FPID No.:  406143-1-22-01

Florida’s Turnpike Enterprise – SUNPASS CHALLENGE, PGA Boulevard & Indian Town Road Toll Plaza; Palm Beach County; FPID No.: 412276-1-32-01 & 412276-4-52-01

Florida’s Turnpike Enterprise – Canal Slope Evaluation; Mainline (SR 91) MP 113.9 to MP 115.5; Palm Beach County; FPID No.: 417281-3

Florida’s Turnpike Enterprise – Pompano Operations Center Expansion; Broward County; FPID No.:  417128-1-32-01

Florida’s Turnpike Enterprise – Sawgrass DYWIDAG Sign Replacement; Palm Beach, Broward & Miami-Dade County; FPID No.: 232345-2-52-01

Florida’s Turnpike Enterprise – Hurricane Sign Replacement; Broward County; FPID No.: 429349-1-32-01

Florida’s Turnpike Enterprise – SR 821 (HEFT) / NW 12th Street Interchange; Miami-Dade County; FPID No.: 427687-1-32-01

FTE: Design Build – Sawgrass AET Phase 5B; Broward County;  FPID No.:  431281-1-52-01 & 431281-3-52-01

Resurface Turnpike Mainline MP 153.23 to MP 169.32; St. Lucie County; FPID No.: 436517-1-32-01 & 436517-3-32-01

Resurface Turnpike Mainline St Lucie County (MP 138.1 – 153.2); FPID No.: 437986-1-32-01 437986-3-32-01

Mr. Partha Ghosh, Principal Engineer / President of GCME have served as the Senior Engineer / Project Manager & Geotechnical EOR for the following projects along Florida’s Turnpike:

SR 710 / Northlake Boulevard Interchange with Florida’s Turnpike, PD&E Study, Palm Beach County, FL

SR 80 Interchange with Florida’s Turnpike, Palm Beach County, FL